Photography Portfolio

Martin Chandrawinata, PE

Bridge Engineer & Photographer


mpchandrawinata@gmail.com

San Francisco - Oakland Bay Bridge

California, USA

PHOtography

awards

Press Mentions

& Awards

  • 2022 ASCE Bridge Calendar (Final ASCE Bridge Calendar)
  • 2021 ASCE Bridge Photo - 1st Place (HDR Category)
  • 2020 ASCE Bridge Photo - Viewer’s Choice Award finalist
  • 2013 AASHTO Face of Transportation, Grand Prize winner
  • 2013 ENR Magazine Image of the Year (2 photographs)
  • 2012 ENR Magazine Image of the Year
  • 2010 ENR Magazine Image of the Year

Shows & Exhibits

  • 2013 Metropolitan Transportation Commission, Oakland, CA (Exhibition)
  • 2012 Caltrans Bay Bridge Field Office, Oakland, CA (Exhibition)

Bio

An engineer by profession and a passionate photographer by heart, I seamlessly blends technical precision with artistic vision.


While working on the Bay Bridge, I documented the construction from start to finish.

Through an

engineer’s lens



Photographs of the New Bay Bridge East Span

Self-Anchored Suspension (SAS) Signature Span

2009

Temporary Truss Construction

Fabrication

in china

2009

Tower and Orthotropic Box Girder assembly

2009

Tower Fabrication

2009

Sunrays penetrating through bolt holes of the Orthotropic Box Girder

construction

sequence

&

MILestone

moments


2010

Unloading shipment of Tower assembly

2009

Temporary Truss

2010

Placement of the 1st Orthotropic Box Girder (OBG)

2010

Placement of the 4th OBG Panel

2011

With Bob Kick, Tower Project Manager

2011

Tower shaft installation using a strand jack

2012

600V cable installation

2011

Main Cable Installation

2011

Main Cable Installation

2013

CAD welding on the cable wrapping

2013

Demolition of Temporary Truss


Thermal lance cutting involves a high-temperature tool that utilizes oxygen and iron rods, generating extreme heat to melt and sever tough materials like metal. The exothermic reaction forms a molten slag, enabling efficient and precise cutting through industrial materials, particularly in demolition, construction, and metalwork.

2013

Sparks

2013

Demoiltion of Termporary Support

2013

Demolition of Temporary Truss Foundation

2013

Suspension cable crisscrossed forming a diagonal pattern with the Golden Gate bridge in the background

people who

made it happen

2009-12-04

Stressing cables for tie down

2010

Crew boat taking workers to and from the jobsite

2009

Howard and Chris - Construction Elevator Operators whose job was to take workers up and down from the base level to the bridge deck level and to the tower. They often remind people to work safely during this short elevator ride.

2012

Dave Electrical Foreman and Tony ... installing electrical conduits inside the OBG

seismic

safety

Opening

Labor

Day 2013

2013

The night before the bridge opens to the public

2013

Chain cutting ceremony by Liutenant Governor Gavin Newsom

2013

Old and New

2013

The night before the bridge opens to the public

Bay

Bridge

ART

2013 Streaks of Lights

2013 Reflections

2013 Lights Shine Through

Aerial

photography

All images are copyrighted. mpchandrawinata@gmail.com